Industry Info

Will the semi wet raw material crusher clog the raw materials during use?

2023/09/27
The general manufacturing process of organic fertilizer includes organic matter inoculation fermentation (pre-fermentation), main fermentation, crushing, compound mixing, drying, granulation (disc granulator machinenpk fertilizer granulator, etc.), cooling, sorting, sorting, including Weigh and pack.
Semi-wet material crusher is a professional equipment with many years of experience and advanced crushing technology at home and abroad. This machine completely solves the problem of crushing organic matter with high moisture content. It is a national initiative and has been declared a national patent. The successful development of this machine has played an important role in reducing the production process of bio-organic fertilizer and compost, reducing capital investment and saving operating costs. The moisture of this machine used for biological fermentation of organic fertilizer is 25-50%, and the particle size after crushing meets the requirements of granulation. The organic fertilizer made from municipal waste has a crushing effect on glass, ceramics, bricks, gravel, etc., and is safe to apply.

Installation and debugging of semi-wet material crusher:
1. Install on a horizontal concrete foundation and fasten with anchor bolts.
2. Pay attention to the vertical and horizontal directions of the host during installation.
3. After the installation is completed, check whether the bolts of each part are loose, and if they are loose, they should be tightened.
4. Configure the power cord and control switch according to your device power supply.
5. After the inspection, carry out no-load test drive.
What should I do if the semi-wet grinder is blocked during use?
During the working process of the semi-wet raw material crusher, the wet raw materials are finely crushed and then stick together. The fibers of the material are so strong that they won't break easily even when hit with a hammer. The phenomenon of material blocking may also be caused by the high discharge pressure and the failure of the intake valve at the bottom of the crushing chamber to open. Improper operation of employees, etc.
PRODUCTS List+
Products
Tel
contact
inquiry